Slab Moisture Check
Enter your vapor and humidity readings and see whether the slab is ready for epoxy, urethane cement, a polish or a floor covering.

Limits are typical examples, not a promise for any product. Your product data sheet decides, and a moisture-reducing coating can often make a damp slab ready. The drying rule of thumb is about thirty days per inch of slab thickness.
Saved. Your choices will travel with the estimate form at the bottom of the page.
Three quick steps
- 1Pick the floorWhat will go on the slab.
- 2Enter readingsVapor emission and in-slab humidity.
- 3Read the resultReady, barrier or wait.
About the slab moisture check
Where do the readings come from?
A calcium chloride test gives the vapor emission rate in pounds per 1,000 square feet per 24 hours, and in-slab probes give relative humidity.
Are these the official limits?
No. They are typical examples. Your product data sheet sets the limit for the exact system you are using.
What if the slab is too wet?
A moisture-reducing coating can often make it ready, and a polish with a guard tolerates more moisture. Very high readings may need building fixes too.
Services that go with this tool
Moisture Testing and MitigationSlab moisture testing and vapor barrier coatings, so floors and finishes do not fail from water coming up through the concrete.See the service Epoxy
Epoxy FlooringSelf-priming, high-gloss, chemical-resistant epoxy floors for businesses, warehouses and garages, in the color and finish you pick.See the service Epoxy
Commercial Epoxy FlooringEpoxy floors for stores, restaurants, gyms, offices and facilities, with branded colors, lines and a finish that handles daily traffic.See the service Ready for a floor that shines?
Call or text Intelli-Clean in Tampa, or send the form, and we will set up a visit. Tell us about the building and the floor you have now.